東莞市瑞恒華泰電子有限公司Dongguan Ruiheng Huatai Electronics Co., Ltd
1、 Main technical parameters and configuration requirements of steel mesh cleaning machine: technical requirements of process equipment (according to the comments of the review scheme: ★ represents must be met, ▲ can be deviated; others do not meet); Project quantity: 1 full-automatic steel mesh cleaning machine;
1. Equipment appearance specification
★ machine name
Water based multifunctional cleaning machine
★ number of machines
1 set
★ body size
L1220*W1120*H1850(mm)
★ appearance
vertical
★ applicable steel mesh size
L750 × W750 × H40 (mm) [extra large size to be customized] can clean 2pass steel mesh at the same time
▲ weight
550KG
▲ appearance color
Computer white
2. Equipment supply requirements
▲ power supply
AC220V\AC380V 50HZ
▲ environmental requirements
Clean and dry environment, avoid humidity and high temperature
★ working pressure / pipe diameter
0.4-0.6Mp/10mm
★ cleaning process
Left and right mobile high-pressure liquid spray cleaning (cleaning - chemical isolation - coarse rinsing (open loop / closed loop) - fine rinsing (open loop / closed loop) - drying)
★ drying method
High pressure hot air cutting (optional super model)
▲ water source pressure
0.2 ~ 0.3 (MPA), built-in pressure pump;
★ scope of application
Solder paste, printing adhesive steel mesh
★ cleaning liquid recovery and filtration
one μ M (filter micro matter: solder paste, rosin, red glue and pollutants)
★ rinsing liquid discharge and filtration
five μ M (filter micro matter: solder paste, rosin, red glue and pollutants)
★ electric diaphragm pump
Sachiel
★ cleaning time
Cleaning time: 3 ~ 5min, rinsing time: 1 ~ 2min, drying time: 3 ~ 6min, drying temperature: 0 ~ 90 ℃ (cleaning time and times can be adjusted)
★ isolation time of cleaning solution
40~60S
★ maximum volume of liquid tank
42 L*2PCS
★ comparison of cleaning examples
Comparison of cleaning effect of steel mesh (200X microscope) no residual solder paste, red glue particles, rosin particles and impurities
3. Equipment software
★ controller PLC
Mitsubishi PLC
★ battery valve
SMC
★ touch screen
Willem
★ temperature control module
Mitsubishi
★ stepping motor
Research and control
★ ball screw
Shangyin / TBI
★ proximity sensor
OMRON
▲ thermal overload relay
OMRON
▲ intermediate relay
OMRON
★ driver
Panasonic
★ frequency conversion process
The speed of spray fan can be adjusted
★ supporting scraper clamp system
It is used for scraper cleaning, so that one machine can be used for multiple purposes
4. Other
★ safety protection
Emergency stop and safety door induction
Anti acid and alkali corrosion
Durable, acid and alkaline resistant cleaning solution
2、 Installation and commissioning
1. The manufacturer is responsible for lifting, unloading, installation and commissioning of the equipment in the factory designated by the buyer. In order to enable the buyer to make full technical preparation before design and equipment installation, the Seller shall provide the buyer with equipment outline dimensions and water and electrical auxiliary engineering parameters within 15 days after signing the contract.
2. When unpacking the equipment, the relevant technical drawings and accompanying spare parts of the equipment shall be handed over to the buyer in a timely manner. If they are missing, the Seller shall handle them in a timely manner. If they are not handled properly, the buyer has the right to propose to return them.
3. The time for equipment mobilization, installation and commissioning is 7 days. The manufacturer shall arrange engineers to settle in the factory. If the abnormal problems cannot be solved, the buyer has the right to propose to return the goods